搜索
Search
Your current position:
Homepage
/
/
Mongolia 1500TPD Clinker Cement Production Line Project
Number of views:
1000

Mongolia 1500TPD Clinker Cement Production Line Project

Mongolia 1500TPD clinker cement production line is located in Urgun County, Donogovi province, Mongolia, and it is 520 km away from the capital Ulan Bator of Mongolia. It has an extreme climate condition, the annual average temperature is 1.3℃, 40.7 degrees of the extremely maximum temperature, extremely minimum temperature is -41.4℃. The standard frozen soil depth is 2.6m. It was successfully put into production in March 2016.
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
AL015
Quantity
-
+
Stock:
0
详细介绍
Parameters

Mongolia 1500TPD clinker cement production line is located in Urgun County, Donogovi province, Mongolia, and it is 520 km away from the capital Ulan Bator of Mongolia. It has an extreme climate condition, the annual average temperature is 1.3℃, 40.7 degrees of the extremely maximum temperature, extremely minimum temperature is -41.4℃. The standard frozen soil depth is 2.6m. It was successfully put into production in March 2016.

We could not find any corresponding parameters, please add them to the properties table

P.C:210003
Fax:86 25 83575200
苏ICP备14005140号-1

 

E-mail:gd@gdcem.com
Website:www.gdcem.com 
Powered By www.300.cn

P.C:210003
Fax:86 25 83575200
苏ICP备14005140号-1

 

E-mail:gd@gdcem.com
Website:www.gdcem.com 
Powered By www.300.cn